Open the Punch List
- Select the project.
- Open Punch List from the sidebar.
Create a Punch Item
- Select Add Punch Item.
- Enter a Description of the deficiency.
- Set the Location (room, area, floor, or drawing pin).
- Assign a responsible party (subcontractor or trade).
- Set a Due Date.
- Set Priority (low, medium, high).
- Attach photos showing the issue.
- Save the item.
Pin to a Drawing
Punch items can be pinned to a sheet in the Drawings viewer. Open the drawing, drop a pin, and link it to the punch item. The pin and item stay synced.Status Workflow
- Open — newly created, not addressed.
- In Progress — assignee is working on it.
- Ready for Review — assignee marked complete, awaiting verification.
- Closed — verified complete.
- Void — no longer applicable.